Making specific reference to the JCT Standard Building Contract with Quantities 2016, analyze in detail the practical action, and the procedural steps, that Pig’s Ear ought to be taken in connection with the discrepancies and divergences noted in the contract documentation. Also, analyze the legal and contractual position attending Artless’s apparent failure to appoint an architect or professional contract administrator.

Question (2)

What action, if any, should Pig’s Ear be taking under the JCT Standard Building Contract with Quantities 2016 to warn Artless about – and ensure that Artless takes action to address – the inadequate and potentially dangerous roof trusses specified in the designs provided by Artless? (You should give some consideration to the Common Law duty upon a contractor to warn an employer of defects in a design provided by the employer as a point of reference for discussing the issues to which defective and/or inadequate and/or dangerous designs generally give rise in a question between a contractor and an employer.)

Question (3)

Making specific reference to the JCT Standard Building Contract with Quantities 2016, analyse in detail the practical action, and the procedural steps, that are competent to Artless to take in relation to Pig’s Ear during the Rectification Period to put right the disabled ramp and fire escape that Pig’s Ear has failed to install in conformity with the contract documentation. Business Law Assignment: I need help writing a research paper.

Published by
Ace My Homework
View all posts